tuesday: cobblestone landing and raising that brick 1/2 stair
flagstoning the stairs that were built and leveled and ready to go
building the final three stairs--this actually took longer than you'd think. each brick needed to be leveled three ways, front, back, side, and then do that with 6 bricks total for a stair.
after everyone went to bed, david and i came back out to finish laying flagstone. a neighbor came over monday and tuesday nights to help us--showing pu at 9pm on tuesday! we were so touched by his help. the following photos were taken wednesday morning--sunny, balmy, about 50 or 55. i was seriously debating just polysanding the walkway and stairs right then and there. there was a winter weather warning, and the reports were saying it would hit that afternoon. sure enough, rain and cold weather moved in. so it was another week or so until i could finally polysand the remaining walkway and stairs.